Order Helpline 01752 692 221
Order Helpline 01752 692 221

Marsh Portapurra Temporary Sewage Treatment Plant

Code:
MARSH-M

The portable and compact Portapura sewage treatment tank from Marsh Industries has been specifically designed for temporary accommodation (caravans/travel homes), site offices, site toilets and workshops. The Portapura can be installed above or below ground and treats domestic... Read More

from
£3,100.00 Incl. VAT
Earn points

SUPER Rewards Earn points and build more across our SUPERSTORES!

Find out more
Oops! Please select from the options
Delivery from: 5-7 Working Days
Shipping costs displayed in basket.
We can let you know when this product is back in stock.

This product is proving to be very popular and has unfortunately sold out.

Enter your email below and we'll notify you as soon as this product is back in stock:

For delivery Tuesday, Dec 24th - order in:
days hrs mins secs
Subject to stock availability, if products on a 24 hours service are ordered alongside products NOT on a 24 hours service, this may delay your whole order.
View Transport Policy

All delivery charges are included in the final shopping basket and are dependent on the products Scottish Highlands & the Islands where additional shipping charges will apply.

Please note that not all products will incur an additional delivery charge to the Scottish Highlands & the Islands – this is based on the costs from the manufacturer, distributor or courier providing shipping on our behalf. If your delivery address is in the Scottish Highlands and Islands, a member of our helpline team will contact you prior to processing your order should an additional delivery charge apply.

While we make every effort to ensure orders are delivered by the date required, we cannot guarantee availability from the manufacturer or the manufacturer's delivery schedules.

Any variation to web delivery date given will be advised to you by email or telephone. If we are unable to make delivery because access is not possible, we reserve the right to make a failed delivery charge.

Create a wishlist

"Excellent service and great produc…"

Anne Toole

Description

The portable and compact Portapura sewage treatment tank from Marsh Industries has been specifically designed for temporary accommodation (caravans/travel homes), site offices, site toilets and workshops. The Portapura can be installed above or below ground and treats domestic wastewater to a level that is 25 times better than the recommended EN standard.

What are the benefits of choosing Marsh Portapura?

This compact and portable sewage treatment tank is designed specifically for temporary buildings. Design objectives included performance, running costs, installation, transport and storage, making the Portapura the logical choice for sites where temporary buildings are required.

The Portapura’s compact design provides quick and easy installation (where below ground installation can be achieved in approximately 2 hours) with minimum visual impact on the surrounding landscape as well as simple and safe access for maintenance and cleaning.  Systems can be installed above ground and removed/stored when not in use.

The cost of installing and running the Portapura is minimal when compared to larger, commercial systems making it one of the more cost-effective sewage treatment tanks on the market.

Another benefit of choosing the Portapura sewage treatment tank is its impact on the environment. Being CE?approved to BS EN 12566 with an ammonia result that is 25 times better than the recommended EN standard means the Portapura is well within discharge consent requirements.

Technical

  • Available in three sizes - 2, 3 or 5 person units (gravity or pumped outlet)
  • Compact, lightweight construction - No heavy plant required
  • Portable
  • Cost effective installation - Below ground installation can be achieved in approximately 2 hours
  • Outstanding treatment efficiency - 14:19:0.7mg/ltr (BOD:Suspended solids:Ammonia)
  • Near silent air compressor - Ensures minimal running, maintenance and servicing costs
  • Electrical consumption: 1.8kWh/d - Equivalent to the daily use of a lightbulb
  • CE?approved to BS?EN 12566
  • Fire resistance tested in accordance with EN ISO 11925-2:210
  • Tested for structural integrity in accordance with EN ISO 179-1/1eA
  • Neck extensions are available for deeper installations


Do not install a Portapura treatment plant in water logged or uneven ground.

Do not remove the covers of the Portapura, or access the unit in any way, without firstly isolating the mains power.

Details

Product Type Sewage Treatment Plant Capacity 1-6 Person Population 2 Person
3 Person
5 Person
Invert 445mm
685mm
885mm
Domestic Or Commercial Commercial
Domestic
Gravity Or Pumped Gravity Install Type Standard

Questions & Answers

There are currently no questions for this product.

loading...

Product Enquiry Form

Marsh Portapurra Temporary Sewage Treatment Plant

*Required Field