This unique system of products combines to form the Marshalls CPM Perfect Manhole system; designed and manufactured to last a minimum of 120 years that provides a sealed manhole system that gives up to 40% savings on greenhouse gases compared to traditional manhole constructio... Read More
This unique system of products combines to form the Marshalls CPM Perfect Manhole system; designed and manufactured to last a minimum of 120 years that provides a sealed manhole system that gives up to 40% savings on greenhouse gases compared to traditional manhole construction and eliminates the need of ready mixed concrete to form the traditional base, chamber benching and further concrete to surround the manhole. A complete manhole can be installed in as little as 30 minutes, making safe site practice a real winner when using the Perfect Manhole as it reduces the need to work in confined spaces and eliminates the need for wet trades resulting in rapid construction compared to traditional methods as well as a reduction in the time the excavation is open.
Please note: This manhole ring does not come with steps, if they are required please contact us to discuss this option.
The Perfect Manhole complies with BSEN 1917:2002 and BS5911-3 and has been accepted for use by all major UK companies.
DN: 1200mm
Depth: 250mm
Please note: Perfect Manhole rings require special lifting equipment as standard chamber ring lifting bolts do not work on this product. 1200 Sling set or 1500 sling set depending on diameter, or 2.5T lifting heads or 5t lifting heads with customers slings.
There are no product downloads to show.
There are currently no questions for this product.
Products We Recommend
Product Enquiry Form
0% for 4 months
Learn more