The One2Clean Plus sewage treatment plant from Graf will treat the water, so that it is clean enough to be discharged into a water course (depending on how frequently it is being used and the manufacturer’s guidelines). However, One2Clean Plus sewage treatment plants do ... Read More
SUPER Rewards Earn points and build more across our SUPERSTORES!
Find out moreThe One2Clean Plus sewage treatment plant from Graf will treat the water, so that it is clean enough to be discharged into a water course (depending on how frequently it is being used and the manufacturer’s guidelines). However, One2Clean Plus sewage treatment plants do require a power source and requires emptying approximately every year.
The water discharged from the One2Clean Plus packaged treatment plant must meet the relevant British Standard which is BS EN 12566 for small sewage treatment plants and BS 6297:2007 for drainage fields.
Question:
What is the difference in the weight class
Answer:
The difference between the weight class is that A15 is suitable for pedestrians to walk over with a weight rating of 1.5 tonnes. However, B125 is suitable for smaller vehicles with weight durability of 12.5 tonnes.
Question:
Can the power be switched off when the residence is unoccupied?
Answer:
You can, however it is not recommended on a regular basis. When empty or turned off, the bacteria will die off and will need to be restarted once turned back on.
Question:
What size electric supply does this need
Answer:
You would need a Single phase - 220-240v.
Question:
Does this ship as kit of parts rather than fully assembled (good if it is a kit) and does it have the ability to accommodate reduced flow in the case use in a holiday home complex.
Answer:
This gets delivered fully assembled ready to go into the ground. It can fluctuate the capacity of effluent as needed
Products We Recommend
Product Enquiry Form
0% for 4 months
Learn more